Road heavy transport from Buttrio (Italy) to Slatina (Romania) of 2 pieces having 5.00 x 3.15 x 4.05 – 77.5 tons and 4.50 x 3.60 x 4.05 – 78.5 tons. For the transport, Holleman used 2 low beds with 12 axles and 35 cm from the ground, each.
These two pieces together with other 2 hidraulic cilinders having 33 tons, each, were unloaded and assembled, in Slatina, by heavy lift division of Holleman, in a 9 m height hall. In order to mount the pieces and put them on final position, Holleman Heavy Lift used gantry crane with a capacity of 1,000 tons and the whole procedure lasted aproximately one week.